What Does Geyser Installation Mean?

Wiki Article

Indicators on Geyser Installation You Should Know

Table of ContentsOur Geyser Installation DiariesOur Geyser Installation Statements8 Simple Techniques For Geyser InstallationGeyser Installation Fundamentals Explained
In this write-up I will certainly describe the typical fundamental demands of a noise, modern-day high pressure, straight setup. If you require detail, then I suggest that you take a look at the site (). For any individual looking for, contact your local pipes organisation. The complying with description associates with a modern high pressure (400/600Kpa) system typically made by Kwikot South Africa.

geyser installationgeyser installation


Less typical are old low stress systems (100kpa) open pipeline or "Latco" type systems. Know that the components are NOT compatible between the two distinctive systems - High stress and Reduced pressure! It is possible to remove an old reduced stress system and change it with a contemporary high stress system however - you acquire a new high pressure geyser and also install it according to the current spec.



The hot spring rests in a tray made of plastic (often red) or tin plate. I prefer the plastic ones.

Because June 2001, the drip tray is not optional - its obtained to be there as well as there has to be a drain pipe for it! The drain is a 50mm PVC drain that drains the tray by piping the water out the house. I have actually seen numerous drip trays set up without drains pipes! If your installment pre-dates June 2001 you might intend to get a plumbing to look at it.

More About Geyser Installation

The 2 vacuum cleaner breakers stand up and down about 30cm over the geyser. These are important, as they stop water siphoning out the hot spring when the chilly supply is quit - geyser installation.

Bear in mind that vacuum cleaner breakers are a reasonably brand-new need - there are still thousands of old HP systems out there without vacuum breakers as well as I am yet to see one collapse. Simply due to the fact that I have not seen it does not mean it's not happening!

The cool water side is the side that directly links to the drain cock as well as goes into the hot spring near the bottom. After the closed off shutoff you would typically discover a Pressure Control Shutoff (PCV). There are a number of different kinds, mainly constructed from brass yet some are made of plastic.

This is where the PCV launches stress as well as this is the pipeline that often trickles. Don't worry if you can not locate the PCV alongside the hot spring - it might be totaled 10 metres away, frequently in an extra accessible location on a wall surface outside. Sometimes it's in a little plastic box outside.

Geyser Installation Can Be Fun For Anyone

This is a crucial element that should never be More about the author messed with or 'fixed'. This shutoff should have a steel (copper or steel) pipeline linked to it and the pipe have to lead straight out the building. This vent pipeline is an essential safety and security function of the whole system. It must be made from copper or steel - plastic.

The T&P shutoff is the least optional component - it needs to exist! - The weight of the geyser need to be appropriately supported on the roof covering trusses - a minimum of 2 supports under the 'feet' of the hot spring. If it looks unsteady obtain a plumbing to check it out.

This was not a need on old geysers, however it is now and also it deserves suitable one. The geyser needs to be earthed! I have actually seen many hot springs with the earth cord inapplicable. All the copper pipes should also be earthed weblink as well as adhered to the geyser earth. This is not a minor safety measure! Get a qualified electrician to examine your setup if the bonding is missing or looks dodgy.


Again, these are usually just left existing following to the geyser. There are basically just two main thermostat types - the contemporary round "Kwiktherm" in newer Kwikot hot springs as well as the VK (rectangle-shaped block) kind in older hot springs and in some newer non-Kwikot devices. The geyser might be fed (cool water) with polcop (plastic) pipe - as much as the turned off shutoff, however the pipe into and out of the hot spring should be copper or galvanized steel.

The Definitive Guide to Geyser Installation

geyser installationgeyser installation


The warm water side need to be copper, steel or appropriately ranked (70) plastic or composite pipeline. Note that you need to contend click here for more least 1m of copper/steel pipe out the hot spring - you may not connect plastic (compound) pipe straight to the hot spring. As above, the PCV and also T&P must be made from copper or steel - particularly the vent out of the T&P valve.

geyser installationgeyser installation


I have actually seen a number of installments where the installer has simply run a brief size of 22mm copper right into the drip tray with the suggestion being that the T&P can vent straight right into the drip tray. A concept due to the fact that the warm (100 +) water/steam thaws the drip tray and also the PVC drain pipeline.

The PCV is commonly above the hot spring and also the cool water flows down into the hot spring. This is fairly essential because it develops an anti-syphon loophole that avoids the hot spring from draining back with the inlet in the occasion of a supply of water failure. If you fume water coming out your cold taps when the supply of water fails then this is not working properly.

Report this wiki page